SL/ No. |
Name of the Client. |
Nome of the Project |
Type of work |
Ending Period/ Duration |
01. |
Pran/RFL Group |
Installation, erection works. |
5 Nos. Gas Boiler, 3 Nos. exhaust boiler, 2 Nos. Ammonia plant. 8 Nos. 2MW gas generators, Chiller, utility pipe line, different type of fabrication works and insulation works. |
1997 To 2011 |
02. |
Partex Group |
1000 TPD Sugar
Refinery Erection. |
Sugar Plat erection, with lifting of all machineries, 270M length conveyer belt, 6 MW steam turbine, 70 tons capacity water tube boiler. |
2006 |
03. |
Deshbhundu Sugar Mills Ldt. |
500 TPD Sugar
Refinery Erection. |
Sugar Plant erection, with lifting of all machineries, all utility tanks fabrication & erection. |
2000 To 2011 |
04. |
Precision Energy Ltd. at |
60 MW. Power Plant of Precision Energy Ltd., at Asughong, B.Baria. |
Unloading and carrying in foundation of 15 Nos. gas Gen set and erection, fabrication, installation of all equipment including radiator and ducting works. |
2009 |
05. |
United Power Plant Ltd. |
50MW of & United Power Plant Ltd., Ashuganj, Brahmanbaria |
All Ducting of 50MW Power Plant work |
2011 |
06. |
Karnaphli Paper Mills Ltd. |
Karnaphli Paper Mills Ltd., at 92, Sadarghat Road,
Chittagong. |
Supply, fabrication, erection of 15000 Ltrs capacity petroleum storage tank, Pipe line connection with air compressor to cooling line, New installation compressor line and low & medium pressure steam line. |
2011 |
07. |
TSP Complex Ltd. |
TSP Complex Ltd., Patenga, Chittagong. |
Painting of different plant vassal, tank, column, pipe & structure, re-placement of different pipe line and exhaust line. |
2011 |
08. |
Urea Fertilizer Factory Ltd. |
Urea Fertilizer Factory Ltd., Plash, Narsingdi. |
Re-placement of exhaust line for GTG-2 and insulation works of inside chimney struck works. |
2010. |
09. |
Ashugonj Fertilizer & Chemical Co. Ltd. |
Ashugonj Fertilizer & Chemical Co. Ltd., AShugonj, B. Baria. |
Replacement of Tube Bundle works. |
2011 |
10 |
Capital Board Mills Ltd. |
Capital Board Mills Ltd., Ghorasal, Narsingdi |
Insulation & sheet covering work of steam line work. |
2011 |
11 |
ACI Salt Ltd. |
ACI Salt Ltd., Rupgonj, Narayangonj. |
Cleaning 15 tons capacity water tube boiler`s tube by fixable shaft |
2010 |
12. |
Bengal Glass Works Ltd. |
Bengal Glass Works Ltd., Sarulia, Demra, Dhaka. |
Different fabrication works, pipe line works for oil, water, air line and steel structure, duct line, and electrical panel board making & wiring with civil works. |
2011 |
13. |
Transcom Beverages Ltd. |
Telirchala, Mouchak, Kaliakoir,
Gazipur. |
Supply of materials & fitting, fixing of 2 Nos. 1 MW Diesel generator erection works and Process pipe line works. |
2011 |
14. |
Hashem Agro Processing Ltd.
Hashem Foods Ltd. |
Hashem Agro Processing Ltd., Chabbish Nagar, Buypur, Godagari, Rajshahi.
Hshem Foods Ltd.,
Volta, Rupgonj. N.Gonj |
A)Supply of Materials, B) Fabrication & commissioning of 40 Tons & 30 tons capacity Furnace oil storage tank, C) Furnace oil service tank 1800liter, D) 10 T Feed water tank, E) 50 ft. Chimney, F) 8 ft. Steam Header and G) Required fixture & fittings to complete all respect for 5Ton Boiler, H) Diesel tank 10000 Ltr. & 1800 Ltr. And 2 Nos. pump for 1MW diesel generator works. |
2011 |
15 |
Pidilite Speciality Chemical Industries (B.D) Pvt. Ltd. |
Pidilite Speciality Chemical Industries (B.D) Pvt. Ltd., west Mukterpur, Munshiganj |
Unloading of machineries and fabrication, erection, installation of all machinery, ETP, WTP, Boiler including insulation & painting works. |
2008 |
16 |
Abdul Monem Energy Ltd. |
Abdul Monem Energy Ltd., Protap Nagar, New Town Thana Ssonargaon,
Narayangonj. |
Erection and Installation of 2 Nos. 40 Tons capacity Boiler with chimney WTP, Lime at Solte house Pump Pipe lien works. |
2006 |
17. |
Nitol Sugar Mills Ltd. |
Nitol Sugar Mills Ltd., Kaliya Chapra, Kishoregonj. |
Erection of 2 Nos. Boiler 35 tons evaporation capacity with chimney high 100’-0” dia 4’-0” with feed water tank, pipe line, water line steam line insulation works and instrument fitting completed, including electrical. |
2007 |
18. |
Square Pharmaceuticals Ltd. & Square Toilets & Consumer Products Ltd. |
Square Toilets & Consumer Products Ltd., Shalgareya, Pabna. |
Erection of 3 Nos. Boiler, Steam, water and Gas Pipe line, Chimney, tank and vat Fabrication including Insulation works. |
2004, 2005 |
15. |
Gumti Textiles Ltd. |
Gumti Textiles Ltd., Gazipur. |
Repair and maintenance of 5 Ton Capacity Boiler works. |
2011 |
16. |
P.N. Composite Mills Ltd. |
P.N. Composite Mills Ltd., at Gazipur. |
Repair and maintenance of 10 Ton Capacity Boiler works. |
2010. |
18. |
Padma Oil Company Ltd. |
Padma Oil Company Ltd., Strand Road, Sadarghat, Chittagong |
Renovation of bottom & lowest shell course of steel storage tank No 64. Tank dia 84’-0” height 40’-0” |
2008 |
19. |
Setabgonj Sugar Mills Ltd. |
Setabgonj Sugar Mills Ltd., Setabgonj, Dinajpur |
Re-erection of sulphur house, civil works, steel structure building and steel truss fabrication works. |
2008 |
23. |
North Bengal Sugar Mills Ltd. |
North Bengal Sugar Mills Ltd., Paksey, Pabna. |
Erection of 40 tons capacity Boiler with chimney dia 4’-0” height 100’-0” including feed water tank, steam line and insulation works, water line, electrical works. |
2000 |
24. |
Rajshahi Sugar Mills Ltd. |
Rajshahi Sugar Mills Ltd., Horeyan, Rajshahi. |
40 & 20 tons capacity 5 Nos. Boiler re-tubing and masonry works |
1993-1994 |
25. |
Carew & Co. (BD) Ltd. |
Carew & Co. (BD) Ltd., Darsana, Chuadanga. |
1200 tons capacity molasses storage tank, boiler repairing re-tubing works and different pipe line works |
1995 To 2008 |
26. |
Zil Bangla Sugar Mills Ltd. |
Zil Bangla Sugar Mills Ltd., Dewangonj |
18.5 tons capacity 2 Nos. Boiler re-tubing and masonry works |
1997 |
27. |
Shampur Sugar Mills Ltd. |
Shampur Sugar Mills Ltd., Shampur. |
18.5 tons capacity 1 No. Boiler re-tubing and masonry works |
2002 |
28. |
Kushtia Sugar Mills Ltd. |
Kushtia Sugar Mills Ltd., Jogote, Kushtia. |
20 tons capacity 3 Nos. Boiler re-tubing and masonry works |
1989 |
29. |
Faridpur Sugar Mills Ltd. |
Faridpur Sugar Mills Ltd., Faridpur. |
12.5 tons capacity 2 Nos. Boiler re-tubing and masonry works |
1986 To 2006 |
30. |
Mobarkgonj Sugar Mills Ltd. |
Mobarkgonj Sugar Mills Ltd., Naldangha, Jhenidha. |
12.5 tons capacity 2 Nos. Boiler re-tubing and masonry works |
1982 & 2002 |
31. |
Panchagor Sugar Mills Ltd. |
Panchagor Sugar Mills Ltd., Panchagor. |
12.5 tons capacity 2 Nos. Boiler re-tubing and masonry works |
2002 |
32. |
Tharkuragoan Sugar Mills Ltd. |
Tharkuragoan Sugar Mills Ltd., Tharkuragon. |
20 tons capacity 2 Nos. Boiler re-tubing and masonry works |
2005 |
33. |
North Bengal Sugar Mills Ltd. |
North Bengal Sugar Mills Ltd., Gopalpur, Natur. |
30 tons capacity 3 Nos. Boiler re-tubing and masonry works. |
2002 |
34. |
Amin Jute Mills Ltd. |
Amin Jute Mills Ltd., Shilo shohor, Chittagong. |
Boiler re-tubing with fire bricks and red brick works. |
2001 |
35. |
UMC Jute Mills Ltd. |
UMC Jute Mills Ltd., Narsingdi. |
Boiler re-tubing with fire bricks and red brick works. |
1988 |
40. |
Pubali Jute Mills Ltd. |
Pubali Jute Mills Ltd., Ghorasal, Narsingdi. |
Boiler re-tubing with fire bricks and red brick works. |
2005 |
41. |
Bangladesh Jute Mills Ltd. |
Bangladesh Jute Mills Ltd., Ghorasal, Narsingdi. |
Boiler re-tubing with fire bricks and red brick works including electrical works. |
1986 |
42. |
Multi Febs Ltd. |
Multi Febs Ltd., Konabari, Gazipur. |
Erection 1 No. 5 Tons capacity Boiler with chimney, steam line, feed water tank and insulation works. |
2002 |
43. |
Ulrtr Pharama Ltd. |
Ulrtr Pharama Ltd., Dhamri. |
Erection 1 No. Boiler and pipe line insulation work & Erection, repairing and installation of Central Air condition including duct line and insulation work |
2006 |
44. |
City Oil Mills Ltd. |
City Oil Mills Ltd., Rupshi. |
Repairing of 10 tons capacity Boiler. |
1998 |
45. |
Rahman Chemical Ltd. |
Rahman Chemical Ltd., Tarabo, Demra. |
Erection of 8 Nos. capacity boiler, boiler chimney, feed water tank and machinery work. |
1985-86 |
46. |
Rangpur Sugar Mills Ltd. |
Rangpur Sugar Mills Ltd., Mohemagonj Rangpur. |
Boiler re-tubing works & Machinery works. |
1982 |
47. |
Khulna Hardboard Mills Ltd. |
Khulna Hardboard Mills Ltd. Kalishpur, Khulna. |
Boiler re-tubing works & Machinery works. |
2006 |
48. |
Pakiza Printers Ltd. |
Pakiza Printers Ltd. shampur, N-gonj. |
Boiler erection & commissioning |
1993 |
49. |
Eastern Refinery Ltd. |
Eastern Refinery Ltd. North Patenga, |
Dismantling and repairing of product storage tank. |
1984 |
50. |
Kohinoor Chemical Co.(BD) Ltd. |
Kohinoor Chemical Co.(BD) Ltd., Tejgoan I/A, Dhaka |
Boiler works & boiler tube re-placement works. |
1984, 2010 |